Monday, 3 February 2014

filming schedule

4) Shooting sched
Shot
Date & time
Location
Content /Action
Shot type & Duration
Costume/ hair/ make up
Iconography
Personnel
Equipment
1
20.11.13
11.30am
Beth’s house
Glitter in a speaker
Close up shot
N/A
 Glitter, speaker
Empty drinking glass and near empty drinking bottle
Artist
Camera person
Location manager
Props /
Digital camera, batteries, tripod, Tape / memory card
2

20.11.13
12.30
Beths house
Singing into the camera
Close up and low angled shot
Hat and tartan patterned cloths
N/A
Artist camera man and director
Camera and tripod
3

20.11.13
1.10
High beach fields
Shots with artist and artist partner
mid shot
White dress with black coat over the top for artist.
And jeans and leather jacket for artist partner
Tree in the background of the shot
Artist, director camera man and artist partner
Camera and tripod
4
20.11.13
6.45
London train station and city
The artist and her partner going out on a date to London
Mid and close up shots
Main artist dressed in jeggings and black leather jacket. And artist partner dressed in similar wear

Confetti cannon,
Drink cans
Camera man director, artist and artists partner
Camera, confetti cannon
5
20.11.13
7.45
Beths house
Fireworks going off as artist and partner watch and cuddle

Mid, far, close and low
White dress with black coat over the top. Artists partner has not changed
Fireworks, bench swing, smoke
Artist, director, camera man and artist partner
Fireworks lighter camera tripod
Bucket of water






6
21.11.13
6.45
Pub
Artist partner cheating on artist with another woman
mid shot
Jeans and leather jacket

Other girl : pink top jeans and grown boots
Pool table
Drinking glasses
Slot machines
Bar and mobile phone
Camera man director artist artists partner
Other girl
Camera tripod
7
30.11.13
7.45
Viler club
Artist getting over the breakup by going out with friends  
Low angle
Close ups and mid shots
Red dress
Shot glasses
Party lights
Camera man artist new partner who artist meets at the club director
Camera





















1 comment:

  1. Within this post, you also need to include an introduction to explain what a filming schedule is and a summary to explain if you made any changes to your plans.

    ReplyDelete